Right ingredient. Right lot. Right paperwork.
POs, supplier dates and COA chasing, done for you. Release stays with quality.
Today
You do everything. Agents should!
- ManualAgent Read lot plan
- ManualAgent Check approved supplier
- ManualAgent Convert pack units
- ManualAgent Key the PO
- ManualAgent Read the ack
- ManualAgent Check best-by
- ManualAgent Chase the COA
- ManualAgent Notify quality
- ManualAgent Match invoice
- ManualAgent Pay
What it costs
Where money is lost.
- Missing COA Truck here, no certificate
- Short shelf life Best-by before the run
- Price swings Commodity moved since the contract
- Late packaging No film, no run
The solution
No integrations. No babysitting.
The agent works your screens like a trained employee, by your rules.
- Screen, mouse, keyboard It uses your apps the way your team does.
- Runs on your machines In your sessions, with the logins you give it.
- Rules decide, not the model Your limits, checked the same way every run.
- People approve Spend and exceptions stop for the right person.
- Every run on record Documents, values, approvals, saved records.
The solution
Hand the whole cycle to an agent
- Reads lot plan
- Checks supplier & spec
- You approve PO
- Places PO
- Reads ack dates
- Chases the COA
- Quality releases
Agent does itYou decide
How it works
Five steps. Zero re-typing.
-
Step 1
It reads the lot plan
Ingredient, spec revision, quantity and the date the run needs it.
Inbox
Lot plan BK-1142 · Plant 3
Granola bar run Wed 11/18 · materials by Mon 11/16
Checked request
✓RM-2210 rolled oats, spec rev 4 · 20,000 LB
✓RM-3145 clover honey, spec rev 2 · 7,200 LB
✓PK-0870 printed film, rev 7 · 40 rolls
✓No duplicate open PO
-
Step 2
It places the approved PO
Approved supplier, current spec, contract price in contract units.
PO ENTRY PO#: 51208
VENDOR: LARKSPUR APIAR
LN PART QTY COST
01 RM-3145 7,200 LB $15,408.00
▌
Green screenEpicor Kinetic
PO 51208Emailed to supplier -
Step 3
It checks ship and best-by
Late packaging and short shelf life flagged before the run.
NOVEMBER
SMTWTFS 12345678910111213141516171819202122232425262728293031Need datePromised
Northgate Flexibles · PO 51209
40 rolls ship 11/17. Run BK-1142 needs film on site 11/16.
Earliest is the 17th.
To your buyer
PO 51209 will land 1 days late. ExpediteSwitch supplier -
Step 4
It chases the COA
No certificate? Line held, supplier asked, quality told.
Draft · to Larkspur Apiaries
COA needed · PO 51208, lot LA-24-1031
Your acknowledgment for PO 51208 arrived without a certificate of analysis. Please send the COA for lot LA-24-1031 before the 11/13 shipment.
- PO sent
- No reply, 2 days
- Reminder sent
- Buyer told if still silent
-
Step 5
It matches in contract units
Totes on the slip, pounds on the PO. Converted, then matched.
POQty 7200✓Packing slipQty 7200✓InvoiceQty 7200MatchedPosted. No AP work.
The full process
Food & beverage manufacturers: every step
What the agent does, where you decide, and the rules it checks.
- Lot plan or MRP signal
- Check supplier & spec revision
- Approved for this material?No → route to quality
- Convert to contract units
- Within contract price?No → hold for buyer
- Buyer approves PO
- Key PO in ERP & email it
- Read ship, lot, best-by
- Arrives before need date?No → alert planner
- COA on file for lot?No → request from supplier
- Quality releases the lot
- Post receipt with lot number
- 3-way match in tolerance?No → hold for review
- Build run by discount date
- You release payment
- Paid & remitted
Agent does it You decide Rule check
Built for you
Food & beverage procurement
- 1Lot & specApproved supplier, current revision
- 2COAsNo certificate, no release
- 3Cold chainReefer loads, tight receiving windows
- 4Ingredient price swingsCommodities move between contracts
- 5Co-packers & packagingFilm and cartons, longer leads
Your controls
Your rules. Exactly.
Written once in plain English. Followed every time.
- No COA on file? Hold, request it
- Best-by too close? Flag to quality
- Price off contract? Hold for the buyer
Never, on any run
- Release a lot or clear holds
- Call an ingredient safe or allergen-free
- Accept a substitute ingredient
- Treat a ship notice as a COA
- Edit a spec or supplier list
When a rule says no
It stops and asks you.
Every held item lands in one queue with the documents, the values read and the rule that fired.
- Route to qualityApproved for this material? 2 min
- Hold for buyerWithin contract price? 14 min
- Alert plannerArrives before need date? 1 h
- Request from supplierCOA on file for lot? 3 h
RUN-2291
Route to quality
RuleApproved for this material? No
I stopped here. Everything I read is attached. Your call.
The difference
Your team, before and after
| Today | With your agent | |
|---|---|---|
| Approved supplier check | Looked up by hand | Every line, every time |
| Pack conversions | By calculator | From your item factors |
| Missing COAs | Found at the dock | Requested off the ack |
| Late packaging | Seen on the schedule | Flagged when acknowledged |
Your existing systems
No new systems!
The agent runs where you work.
ERP
-
Epicor -
SAP
-
Oracle -
NetSuite -
Dynamics 365 -
Infor SyteLine -
Sage 100/X3 -
Acumatica -
SYSPRO -
Plex -
QuickBooks -
Fishbowl
Supplier portals & pay
-
SAP Ariba
-
Coupa -
Amazon Business -
Grainger -
BILL -
AvidXchange
Inbox & documents
-
Excel -
Outlook -
Gmail -
Teams -
SharePoint -
Acrobat / PDF -
DocuSign - Scans & photos
Screens differ by version and setup; we confirm the exact steps on your system before a pilot. Logos and product names identify systems only and belong to their owners; they do not imply a partnership or endorsement.
Your numbers
How many hours can you get back?
Your volume, your times, your labor cost. Estimates, not results.
Ingredient PO lines × (minutes today − minutes with the agent) ÷ 60 × hourly cost
These are example assumptions, not results. Example assumptions only: minutes cover supplier and spec checks, PO entry, reading the acknowledgment and chasing documents. Quality review time is not included and does not go away.
Demonstration
Recordings in production
FAQ
Questions buyers ask us
Can it verify COAs?
It checks that a required COA is present and that it names the expected supplier, item and lot. It does not evaluate test results or decide whether the ingredient meets spec; your quality team does that.
Will it approve ingredient substitutions?
No. A different ingredient, grade or supplier is routed to the people who own that decision, normally quality and purchasing. The agent will not place an order for a substitute on its own.
Can it track supplier certificates?
Yes, for the documents your matrix lists. It records which documents have arrived for each PO and lot, requests missing ones, and can flag certificates that are near the expiry date recorded in your list.
Does it change quality status in our ERP?
No. It can note that a document was received. Release, hold and rejection stay with quality users.
Which ingredient gives you trouble?
- We build itYou show us the work once.
- Start to finishDoes exactly what your team does.
- No-risk trial$0 setup. See it work before you scale.
Bring one ingredient PO and the documents it's supposed to come with.
Get demo